Water Treatment, Oil Separators & Septic/Sewage Treatment
Map
About Us
Products and Services
FAQs
We service North Queensland and can travel in and around remote areas as well.
Micro-nova domestic grey water systems are easy to install, regularly serviced by trained distributors, and can supply anywhere up to 200,000 litres per year of clean treated water to outdoor plants. Use grey water from the shower, bath and laundry to keep your garden look it's one of the best.
24hr Emergency Service, Flexible Hours, Open Late, Open Monday - Friday, Open Saturdays
Tanks
Council Submissions, Installations, Manufacturing
Earthsafe, Econocycle, GardenMaster, RI Industries
Commercial, Filters, Industrial, Pumps, Residential
24hr Turnaround, Accredited, Australian Operated, Australian Owned, By Appointment, Certified, Consultations, Emergency Services, EPA Approved, Evaluations, Factory Authorised, Factory Direct, Family Operated, Family Owned, Free Quotes, Guaranteed, Inspections, Insured, Licensed, Locally Operated, Locally Owned, Maintenance Contracts, Mobile Service, On-Site Services, Owner Operated, Quotes, Registered, Standards Australia, Warranties, Water Recycling, Workcover Approved
Commercial Plumbing, Septic/Sewage, Black Water Treatment, Pumps, All Brands, Water Recycling, Advanced Secondary Treatment, A Class, Waste Water Treatment & Recycling, Water Storage, All Stormwater Drainage, Hot Water Systems, Backflow Prevention Devices, Spill Detection, Sludge De-Watering, Storm Water Management, Air Blowers, Trade Waste, Secondary Treatment, Grey Water Treatment, Waste Water Treatment Systems, Roofing, Heat Pumps, Solar Systems, Testing, Primary Septic Treatment, Oil Separators, Rainwater Tanks, All Water Treatment, Downpipes, Sludge De-Water, Alarms, Specialist Maintenance, A Plus, Guttering, Domestic & Commercial Plumbing, Domestic Plumbing, Septic Systems, Water Treatment, Thermostatic Mixing Valves, All Plumbing Installation, Specialist Maintenance Plumbers, Septic Tank Cleaning, Pumps, Blocked Drains, All Sewer Drainage, Water Harvesting, Irrigation Systems
Yes, it is possible to convert your existing septic system into an aerated wastewater treatment system, as long as your current tank is the correct capacity and in good working condition.
The average system needs to be pumped out between 8 and 10 years.
The Aqua-nova wastewater treatment system is to be serviced 4 times a year as per requirement of the state laws, and this also keeps the system running correctly and safely for all household members.
The Aqua-nova is a two tank system - primary and secondary.
Clean water that can be used on gardens or lawns as per council requirements.